Stack Work
This stack work showcases the installation of a vertical drainage stack system designed to efficiently manage wastewater flow from multiple levels of the building. Our team installed high-quality PVC piping with precision-aligned joints, bends, and branch connections to ensure optimal flow and ventilation. The stack runs through concrete ceilings and brick walls, securely fixed and sealed to prevent leaks and maintain structural integrity. This installation reflects our commitment to code-compliant drainage solutions, with careful attention to fall, access, and long-term serviceability.















